I fixed up a coffetable for Sergey. He built it last summer and the top wasn't sanded down enough so when it was stained it looked terrible. So I sanded it all down.
Xander helped too.
And put 3 or 4 coats on the top surface, 2 or 3 on everything else. It turned out pretty good.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment